DMCI Homes location

Metro Manila Subway: Live Where the Lines Meet

The Metro Manila Subway is scheduled to run end to end by 2031 or 2032. What you use every day is the train closest to your lobby, and what the subway adds is how far that train can take you. Each DMCI Homes community below sits on a rail line the subway is planned to join.

Last reviewed

LRT-2 train crossing Aurora Boulevard near Anonas Station beside The Oriana, DMCI Homes condo in Quezon City, actual photo
LRT-2 on Aurora Boulevard beside The Oriana, near Anonas Station, where the subway is planned to meet LRT-2. Actual photo.

When you can ride it

The Department of Transportation targets a demo run on the northern end of the line in the first quarter of 2028 and full operations by late 2031 or 2032. It put construction at about 26 percent complete as of November 2025, and in May 2026 DMCI Homes, citing the department, reported the major contracts awarded and tunneling under way at several sites.

Once it runs, the line covers about 33 kilometers and 17 stations, from Valenzuela in the north to Bicutan in the south, with a spur to NAIA Terminal 3. It is planned to meet LRT-2 at Anonas, and LRT-1, MRT-3 and MRT-7 at a common station on North Avenue.

Where each community meets the subway

These communities have units open this September. Each one gives you a rail line today, or soon, and a connection to the subway later.

  • The Oriana

    About 390 meters from LRT-2 Anonas Station, the stop where the subway is planned to meet LRT-2. Today that walk takes you to Cubao in one direction and Antipolo in the other. Once the subway runs, the same short walk also reaches Ortigas, BGC and the airport.

  • Infina Towers

    About 430 meters from LRT-2 Katipunan Station, one stop east of Anonas. Your daily ride is already there, to Cubao or the Katipunan schools, and the subway interchange is one stop away when it opens.

  • Sage Residences

    About 760 meters from MRT-3 Boni Avenue Station in Mandaluyong, with a subway station planned on Shaw Boulevard. MRT-3 already runs the length of EDSA today, and it is planned to meet the subway at North Avenue.

  • The Erin Heights

    A short walk from the future MRT-7 Tandang Sora Station on Commonwealth Avenue, close to UP Diliman, Ateneo and Miriam College. MRT-7 runs toward North Avenue, where it is planned to meet the subway, so the line near your gate reaches the rest of the network with one transfer.

The Erin Heights towers on Commonwealth Avenue, Quezon City, along the MRT-7 route, DMCI Homes condo, artist's perspective
The Erin Heights on Commonwealth Avenue, along the MRT-7 route. Artist's perspective.

Check the commute yourself

Rail timelines move, so judge a home by the train you can use now, not by the one on the plan. It takes ten minutes to check on a viewing.

Walk from the lobby to the nearest station and time it. Then ride one stop in the direction you would travel for work or school. If that commute works for you today, the subway is a gain on top of it, and every year it moves closer to opening, that gain gets closer too.

Entrance plaza and landscaped steps at Infina Towers on Aurora Boulevard, Quezon City, DMCI Homes condo, actual photo
The walk home ends here: the entrance plaza at Infina Towers, Aurora Boulevard. Actual photo.

Find your station

The four above are a start. The rest of the site shows every DMCI Homes community, what is available in it this month, and what it costs in total.

Ask about a specific unit

Tell us the community and the unit you have in mind. One specialist replies during Manila business hours with what is available, the total price, and the monthly terms.

Contact a DMCI condo specialist